Fixed costs$36.5K/mo
Core monthly base
Contribution margin80%
After variable costs
Break-even revenue$45.6K/mo
Revenue to cover base
Break-even timingMonth 1
Launch month
Break-even calculator
Use this calculator to test monthly revenue, variable expenses, and fixed monthly costs against break-even.
Money available to cover fixed costs$1,116,010
$1,328,583 revenue - $212,573 variable expenses
Margin ratio
84%
Covers fixed costs
Yes
Break-even chart Revenue Total costs
Which STEM summer camp expenses are fixed, and which move with enrollment?
Cost classification
Break-even is only reliable if fixed payroll, rent, and safety costs are separated from revenue-linked materials, software, and marketing. Misclassifying one large line can make Month 1 break-even look safer than it is.
Expense
Cost
Break-Even Treatment
Common Mistake
Facility Rental and Utilities
Fixed
Use the $6,500 monthly amount as baseline overhead before camper revenue.
Treating venue spend as optional after deposits are paid.
Insurance and Liability Coverage
Fixed
Carry the $800 monthly amount from Month 1 through Month 60.
Ignoring coverage needs before registration opens.
Program Director payroll
Fixed
Model the $85,000 annual salary as core leadership at 1.0 FTE each year.
Tying core leadership pay directly to camper count.
Lead STEM Instructor payroll
Semi-fixed
Add staffing in steps: 2.0 FTE in the first year, rising to 3.0 FTE in the second year.
Hiring ahead of confirmed cohorts.
Assistant Instructor payroll
Semi-fixed
Scale by staffing blocks, starting at 3.0 FTE in the first year.
Assuming staff can flex daily without notice.
Project Consumables and Kits
Variable
Apply 6.0% of revenue in the first year, then lower the rate as volume improves.
Underpricing materials-heavy robotics work.
Curriculum Licensing and Software
Variable
Use 3.0% of revenue in the first year for seat-linked curriculum and software use.
Missing per-seat software limits.
Digital Marketing and Lead Acquisition
Variable
Apply 8.0% of revenue in the first year as paid registration volume scales.
Spending before tracking paid registrations.
How does break-even shift from a lean launch to base roster and full capacity for this STEM summer camp?
Scenario table
Break-even is safest in the base and full cases because fixed costs stay flat at about $36.5k a month while revenue rises with occupancy. The core model still shows Month 1 break-even, so treat this as planning math, not a guarantee.
Planning figures only; actual enrollment mix, pricing, and staffing can move the result.
Scenario
Monthly Revenue
Variable Costs
Fixed Costs
CM Ratio
Operating Profit
Break-Even Signal
Lean launch
$48.2k
$9.6k
$36.5k
80%
$12.1k
Thin cushion; a small enrollment dip can erase profit.
Base roster
$117.6k
$23.5k
$36.5k
80%
$57.5k
Fixed costs are covered with room to absorb softer weeks.
Full capacity
$179.5k
$35.9k
$36.5k
80%
$107.1k
Strong cushion; break-even risk is low at full enrollment.
What breaks the break-even plan for this STEM summer camp?
Stress test
Year 1 has room above break-even, but the cushion depends on full enrollment and tight cost control. The main pressure points are a 20% revenue drop, a 20% fixed-cost jump, or a 5-point rise in variable expenses.
Stress Case
Changed Assumption
Break-Even Revenue
Revenue Gap
Risk Signal
Current plan
Year 1 revenue is $3,736,000 with 20% variable expenses and $438,000 of annual payroll and fixed overhead.
$547,500
$3.19M cushion
Healthy cushion, if enrollment holds.
Revenue shortfall
Revenue falls 20% to $2,988,800 while costs stay unchanged.
$547,500
$2.44M cushion
Still clear of break-even, but sales softness cuts room fast.
Fixed-cost pressure
Annual payroll and fixed overhead rise 20% to $525,600.
$657,000
$3.08M cushion
Lease, staffing, and admin creep are the main watchouts.
Margin pressure
Variable expenses rise 5 points from 20% to 25% of revenue.
$584,000
$3.15M cushion
Higher lead or program costs cut EBITDA, but the plan still clears break-even.
Combined pressure
Revenue falls 20%, variable expenses rise to 25%, and fixed costs rise 20%.
$700,800
$2.29M cushion
This is the real stress case; the business still works, but the cushion is thinner.
What should you verify before you sign the lease and buy the STEM camp setup?
Founder checklist
Don’t lock the lease or spend on the $152K setup until paid deposits show parents will buy at the $1,400 to $1,600 monthly tuition range. Keep the $906K minimum cash need visible, because staffing, capacity, and marketing only work if demand shows up early.
1Paid deposits$1.4K-$1.6K
Collect paid deposits at the Robotics Workshop, Coding Academy, and Digital Design Lab price points before you commit to the lease or the full setup.
2Base overhead$9.5K/mo
Hold fixed non-pay overhead to the planned $9.5K a month for rent, utilities, insurance, CRM, supplies, compliance, legal, and accounting.
3Staff coverage6.5 FTE
Confirm you can cover 1 Program Director, 2 Lead STEM Instructors, and 3 Assistant Instructors in Year 1 without gaps on camp days.
4Variable load80% CM
Keep Year 1 consumables, licensing, digital marketing, and payment fees at the planned 20% of revenue so contribution margin stays at 80% before wages and rent.
5Spot fill120 / 65%
Check that 120 Year 1 spots can sell at 65% occupancy, which equals 78 filled spots, or the launch plan will miss its revenue target.
6Cash cushion$906K
Keep the $906K minimum cash need in view from Month 1, because capex, hiring, and slow enrollment can drain cash before the camp stabilizes.
Choosing a selection results in a full page refresh.