| Wire feedstock |
Variable |
Tie titanium, Inconel, bronze, steel, and specialty alloy wire directly to each part and alloy mix. |
Burying metal input inside overhead and overstating margin. |
| Shielding gas |
Variable |
Apply argon, helium mix, and standard shielding gas by build type and production volume. |
Using one flat monthly gas estimate for all jobs. |
| Robotic welding labor per build |
Variable |
Model build labor per job, separate from salaried engineering payroll. |
Mixing direct build labor with fixed staff wages. |
| Advanced Manufacturing Facility Lease |
Fixed |
Use the $25,000/month lease as a monthly burden from Month 1 through Month 60. |
Reducing lease expense when unit volume is low. |
| Software Enterprise Licenses |
Fixed |
Carry the $5,500/month license expense as fixed operating overhead. |
Spreading the subscription as if it changes per part. |
| Utilities and High-Speed Connectivity |
Semi-variable |
Split the base service from the build-hour power load tied to machine use. |
Treating all power and connectivity as fixed overhead. |
| Equipment Maintenance Reserve |
Semi-variable |
Use the 0.8% model allocation to reflect usage-driven wear plus planned service needs. |
Ignoring higher maintenance as production hours rise. |
| Quality Control Inspector wages |
Semi-fixed |
Step staffing from 1.0 FTE in the first year to 5.0 FTE by the fifth year as volume rises. |
Modeling inspection staff as either fully fixed or per-part labor. |